Sensory Strength and All-Weather Play: Anston Greenlands’ Specialist SEND Hub

Client

Anston Greenlands Primary School

Location

Sheffield, South Yorkshire

Project

Bespoke Scramble Stack with All-Weather Surfacing

Overview

Anston Greenlands Primary School approached us with a specific and vital mission: to create a high-impact physical play zone for their students with complex needs, including non-verbal and autistic children. They required a space that could be accessed 365 days a year, providing a safe but challenging environment where students could develop gross motor skills and sensory regulation. We delivered a heavy-duty, tactile scramble stack installation, engineered for durability and accessibility.

Features

Bespoke Robinia Climbing Structure

Bespoke Castle Tower and Scramble Stack (1)

Bespoke Scramble Stack

Bespoke Scramble Stack (1)

Robinia Castle Tower

Interactive Climbing Walls (3)

Interactive Climbing Walls

Interactive Climbing Walls (4)

Safety All-Weather Flooring

Bespoke Castle Tower and Scramble Stack (2)

Why Schools Trust Precision Timber

We prioritize sustainably sourced timber and handcrafted joinery over “disposable” modular units. This “build-to-last” approach ensures schools receive a high-quality, low-maintenance asset that remains structurally sound for a generation of students. Schools trust us to deliver a sustainable legacy that weathers beautifully into the landscape while maximizing long-term capital investment.